Development Opportunities of the Waterbury-Oxford Airport


The prepared diagram and accompanying table depict available areas for development and potential uses. Detailed descriptions including the area, existing topography, and the availability of utilities, among other characteristics have been prepared for individual parcels and can be made available by contacting the CAA.

WaterburyDev

Development Considerations
  • FAA Airport Design Standards
  • FAR Part 77
  • Federal Obligations
  • Site Topography
  • Utility Availability or Constraints
  • Ground and Airside Access
  • Compatible Land Use
  • Environmental Impacts
Parcel Current Use Recommended Use
A GA Tie-Down Apron Aviation – Hangars**
B Wooded Aviation – Support**
C GA Tie-Down Apron Aviation – Hangars**
D Open Space Non-Aviation**
E Wooded Non-Aviation
Note: Numbered parcels represent existing airport leaseholds. **Indicates space is no longer available.